Decommission the room. Account for every serial.
Shutting down a data center, a server room, or a network closet? Trace takes custody of the servers, storage, and network gear, wipes or destroys every drive, and gives you a record for each serial, so the project closes with proof instead of a pallet count.
Free pickup across the Colorado Front Range · Wiping is free · Every drive tracked by serial
What comes out of the room
A decommission is mostly a counting problem. Every chassis and every drive in it has to end up somewhere you can name.
-
Servers
Rack and tower servers, blades and chassis, with the drives inside them logged by serial.
-
Storage
SAN and NAS arrays, disk shelves, and every drive in them, each with its own record.
-
Networking
Switches, routers, firewalls, load balancers, and other network hardware.
-
Loose media
Spare and pulled HDDs and SSDs, tape, and other removable media.
-
Everything else in the room
Racks, PDUs, cabling, and UPS units: tell us what's there and we'll confirm before the job. Large UPS batteries are quoted.
How a decommission runs
-
01
Send the inventory
An asset list, a spreadsheet, or rough counts by rack are all fine. Flag any drives your policy says must be destroyed, and anything holding CUI or health data.
-
02
We plan it with you
We confirm the pickup date and what we can buy. Within 48 hours of receiving your equipment list, we send an offer for equipment we can buy. Drives marked for destruction are agreed in writing before anything moves.
-
03
Custody changes hands on site
On the Colorado Front Range, our team inventories the equipment on site and takes custody in the same visit. From elsewhere in the U.S., it ships to us at your cost once we've confirmed the details.
-
04
Every drive is wiped or destroyed
Each drive is serialized, then given a verified wipe aligned to NAID AAA / i-SIGMA specifications, or shredded or crushed if you asked for that (from $15 per drive). You follow every serial on a private live link.
-
05
You close the project with records
A Trace Report listing every asset by serial and outcome, a Certificate of Destruction, and the Chain of Custody. Within 48 hours of completed processing, we issue your final batch documents.
Wipe or destroy, drive by drive
Most decommissioned drives don't need to be shredded. A verified wipe is free, comes with a certificate naming the method, and lets working hardware help pay for the project. When your policy, a client contract, or a System Security Plan says a drive must be destroyed, mark it and it's shredded or crushed for from $15 per drive, serialized before and certified after.
We don't run a shred truck. Drives are destroyed at Trace after custody changes hands on site, and you can watch by live video at no charge, or in person on request.
What it costs, or pays
Data center hardware often has resale value. You'll know which arrangement applies to each part of the job before anything is final:
We buy it
We pay you
Newer laptops, servers, and networking gear with real resale value: we make you an offer and pay you for it.
It pays for itself
Free
Most working business equipment: its resale value covers the pickup, the verified wipe, and your documentation. You pay nothing.
Requested shredding or crushing
from $15 / drive
When your policy says a drive must be shredded or crushed rather than wiped and reused. Serialized before destruction, certified after.
Material recycling
Free*
End-of-life gear goes to certified downstream recyclers, with usable parts recovered first. *A few items, such as printers, TVs, and CRT monitors, carry a small set fee.
What you hand to the auditor
While the project is in process, a private live link shows each serial's status. When it closes, you get three documents. Open the samples before you commit to anything.
Trace Report
Every serial, every stage, every timestamp.
View sample →
Certificate of Destruction
Per-drive sanitization or destruction method, verification, and date.
View sample →
Chain of Custody
Every handoff logged, from your server room to the final outcome.
View sample →
Decommissioning questions
Can you decommission a whole server room?
Yes. Send us what's in it, even rough counts by rack, and we'll plan the project from your inventory: how and when the equipment leaves, what's likely to have resale value, and which drives need special handling. Larger projects are scheduled around your cutover dates.
What happens to the drives inside servers and arrays?
Every drive is logged by serial. Reusable drives get a verified wipe, which is free, and a certificate naming the method. Drives you designate are shredded or crushed (from $15 per drive). Drives that cannot be wiped and verified are physically destroyed in-house at no charge, so they can never be repaired or read, and the pieces go to a recycler to be melted down. They are never resold or reused. Requested shredding or crushing with a per-drive destruction certificate is available from $15 per drive.
Do you bring a shred truck to our site?
No. Drives are destroyed at Trace after we take custody, and every drive is logged by serial before it leaves your building. You can watch the destruction by live video at no charge, or in person on request.
Is decommissioned data center equipment worth anything?
Often, yes. Newer servers, storage, and networking gear may qualify for a buyback offer. Within 48 hours of receiving your equipment list, we send an offer for equipment we can buy. Within 48 hours of your acceptance of our offer. Older working equipment usually earns no payout, but its resale value covers the pickup, wiping, and documents.
Can you decommission a site outside Colorado?
On-site pickup covers the Colorado Front Range: Fort Collins to Pueblo — including Denver, Boulder, and Colorado Springs. From anywhere else in the U.S., you ship the equipment to us at your own cost after we've confirmed the details, and it gets the same tracing and documents.
Are you certified?
Trace is not NAID AAA certified. Our methods are aligned to NAID AAA / i-SIGMA specifications. Alignment is not the same as certification, so check your vendor requirements before you engage us.
Shutting down a room?
Tell us where it is, roughly what's in it, and your cutover date. We reply within one business day. Asset lists and spreadsheets are welcome by email at [email protected].